Gas & CO2 Injection/ Storage Facilities

     

Location: Pasadena, Texas
Project: Underground Storage Facility

MCSI provided turn-key instrumentation and electrical engineering/design construction, startup and commissioning for a high pressure underground storage facility. Major equipment consisted of a 6,000 BHP 2-stage reciprocating compressor driven by a VFD controlled 7,200 Volt motor, a glycol dehydrator unit with dual VFD controlled 75 BHP pumps, VFD/MCC building and a Brisol-Babcock based compressor control panel.

     
Copyright 2009 Moore Control Systems, Inc.
Employee Webmail